31/Oct/2017 | 8481309108 | Valve steel 40x13 not bellows complete with mounting details. designed to hold the formation fluid into the tubing and prevent reverse rotation of the rotor of the pump. nominal diameter 5, 8mm. oil field priminenija | *** | ABSENT | *** | *** | 10.40 | 594 | ***** | 84 More Columns Available along with Company Name and Other Details etc. |
31/Oct/2017 | 8481309108 | Check valve in case of steel, it prevents the higher pressure from 9 th stage get in 5th stage compressor main engine amphibious a319 civil aviation. | *** | *** | *** | *** | 1.78 | 1918,54 | ***** |
30/Oct/2017 | 8481309108 | Quick release check valve (non-returnable) of stainless steel, to prevent backflow working environment in connection gas cylinder to the gas analyzer, oil and gas industry - 2 pcs. | *** | NOT INSTALLED | *** | *** | 0.20 | 100 | ***** |
27/Oct/2017 | 8481309108 | Check valve cast iron .prednaznachen to prevent reverse gas flow in rubber hoses when flame treatment of metals. | *** | ABSENT | *** | *** | 1.50 | 26,89 | ***** |
26/Oct/2017 | 8481309108 | Valves (non-return), of cast iron: | *** | ABSENT | *** | *** | 39.70 | 94,03 | ***** |
20/Oct/2017 | 8481309108 | Valve automatic drain from steel has no mechanism drive not bellows. okryvat if discharged in waste allotted. it is a check valve. it is components for passenger aircraft | *** | ABSENT | *** | *** | 0.50 | 4524,89 | ***** |
19/Oct/2017 | 8481309108 | Equipment for installation and operation of npp "kudankulam", not military: | *** | CJSC "CKTI" | *** | *** | 650 | 4,200 | ***** |
17/Oct/2017 | 8481309108 | Valves (non-return) butterfly non-return used for drilling rig zj40. | *** | HONGHUA INTERNATIONAL CO.LTD | *** | *** | 477.30 | 10309,46 | ***** |
17/Oct/2017 | 8481309108 | Steel plate check valve drain water sink toilet sun, p / n zcv241, s / n 07-1115157, 1 pcs., b / c, removed from the a319 / 320/321 vs | *** | CIRCLE SEAL CONTROLS INC | *** | *** | 0.49 | 1613,15 | ***** |
13/Oct/2017 | 8481309108 | Check valve of steel used for diagnosis of works on pipelines under construction | *** | BAKER HUGHES | *** | *** | 1 | 240 | ***** |