30/Oct/2017 | 8402900009 | Of steam boiler (unit) №1 thermal power plants "long fu 1" (boiler unit of cci-600) order 11055.uzel №45. "pipe assembly recycling" -1 komplekt.sostoit from node "drain pipe from collector to pump protection recycling ". the send | *** | TDF | *** | *** | 61,742.50 | 1,239,840 | ***** | 84 More Columns Available along with Company Name and Other Details etc. |
26/Oct/2017 | 8402900009 | Of steam boiler (unit) №2, thermal power plants "long fu 1" (boiler unit of cci-600) order 11049.uzel №9 "screen with frontal gastight festoon convection shaft 2" -1 komplekt. goes to the extent permitted under picking list b62 | *** | TDF | *** | *** | 60,393.30 | 871,500 | ***** |
24/Oct/2017 | 8402900009 | Of steam boiler (unit) №1 thermal power plants "long fu 1" (boiler unit of cci-600) order 11047.uzel №31. "pipe within the boiler" -1 komplekt.otpravlyaetsya in under extent v626725842vk pick list, v626725801vk. is and | *** | TDF | *** | *** | 71,132.10 | 913,500 | ***** |
20/Oct/2017 | 8402120009 | Elektroparogeneratornaya installation. model: pge-200-5u. module is transportable full factory gotovnosti, which comes in form of a block of complete devices (cars, houses), designed to allow it transport | *** | *** | *** | *** | 123 | 1,800 | ***** |
16/Oct/2017 | 8402900009 | Of steam boiler (unit) № 2, thermal power plants "long fu 1" (boiler unit of cci-600) order 11049. node №4. ceiling screen 1 set. goes to the extent permitted under picking list v626725261vk; supplied part-assembled | *** | TDF | *** | *** | 89,386.30 | 987,000 | ***** |
13/Oct/2017 | 8402900009 | Of civil steam boilers for heating, steel, not mechanically, are made by the assembly: | *** | ABSENT | *** | *** | 799 | 2823,86 | ***** |
12/Oct/2017 | 8402900009 | Of steam boiler (unit) №2 thermal power plants "long fu 1" (boiler unit of cci-600), 11058 order node №55 "suspension pipeline bottom of the screen boiler" - 1set. it consists of two sub-assemblies: "suspension pipeline bottom of the screen boiler | *** | TDF | *** | *** | 17,024 | 199,500 | ***** |
10/Oct/2017 | 8402900009 | Of steam boiler (unit) №1 thermal power plants "long fu 1" (boiler unit of cci-600) order 11047.uzel №27. "pressure pipe upper screens" -1 set. goes to the extent permitted under picking list v626725726vk, v626725727 | *** | TDF | *** | *** | 132,259.80 | 4,011,000 | ***** |
06/Oct/2017 | 8402900009 | Of steam boiler (unit) №1 thermal power plants "long fu 1" (boiler unit of cci-600) order 11047.uzel №26. "pressure pipe bottom of screen" -1 set. otpravlyaetsya according to the extent picking list v626725790vk, v626725809v | *** | TDF | *** | *** | 333,517.80 | 2,761,500 | ***** |
29/Sep/2017 | 8402900009 | Of steam boiler cci-600 unit 1 thermal power plant "long fu 1" (11047 order unit 38): items for start and commissioning (final part list №2). supply goes to the extent permitted under picking list v626726047vk. provided | RUSSIA | *** | 49872,8 | KG | 49,872.80 | 401265,38 | ***** |