26/Oct/2017 | 8402900009 | Of steam boiler (unit) №2, thermal power plants "long fu 1" (boiler unit of cci-600) order 11049.uzel №9 "screen with frontal gastight festoon convection shaft 2" -1 komplekt. goes to the extent permitted under picking list b62 | *** | TDF | *** | *** | 60,393.30 | 871,500 | ***** | 84 More Columns Available along with Company Name and Other Details etc. |
16/Oct/2017 | 8402900009 | Of steam boiler (unit) № 2, thermal power plants "long fu 1" (boiler unit of cci-600) order 11049. node №4. ceiling screen 1 set. goes to the extent permitted under picking list v626725261vk; supplied part-assembled | *** | TDF | *** | *** | 89,386.30 | 987,000 | ***** |
10/Oct/2017 | 8402900009 | Of steam boiler (unit) №1 thermal power plants "long fu 1" (boiler unit of cci-600) order 11047.uzel №27. "pressure pipe upper screens" -1 set. goes to the extent permitted under picking list v626725726vk, v626725727 | *** | TDF | *** | *** | 132,259.80 | 4,011,000 | ***** |
29/Sep/2017 | 8402900009 | Of steam boiler cci-600 unit 1 thermal power plant "long fu 1" (11047 order unit 38): items for start and commissioning (final part list №2). supply goes to the extent permitted under picking list v626726047vk. provided | RUSSIA | *** | 49872,8 | KG | 49,872.80 | 401265,38 | ***** |
26/Sep/2017 | 8402900009 | Of steam boiler (unit) №1 thermal power plants "long fu 1" (boiler unit of cci-600) order 11047.uzel №33. "ignition node" -1 set. goes to the extent permitted under picking list v626725757vk, v626725733vk. it consists of two hearth: iu | RUSSIA | *** | 77390,9 | KG | 77,390.90 | 1,645,875 | ***** |
21/Sep/2017 | 8402900009 | Of steam boiler (block) thermal power plant №1 "long fu 1" (boiler units of cci-600), 11047 order unit №29 "bypass pipe lp (low pressure) in a warm box" - 1 set. goes to the extent permitted under picking list v626725822: mec | RUSSIA | *** | 34221,5 | KG | 34,221.50 | 3,150,000 | ***** |